A national strategy · Turks and Caicos Islands

Building the future of the Turks and Caicos Islands

Hurricane-resilient homes, shelters and schools, built by Turks and Caicos Islanders with SABS: an ICC-ES evaluated building system that ships in a container, goes up in days, and is learned in weeks.

For every family on Providenciales, Grand Turk, the Caicos and the Cays.

Caicos Bank Turks Island Passage Atlantic Ocean
Schematic, not to survey scale. Select an island. Hurricane Irma building-damage figures as reported by the Premier from CDEMA assessments, September 2017.
99.9%
of buildings on South Caicos damaged by Hurricane Irma in 2017
55,498
projected population by 2027, up from 32,199 in 2012
$197K–239K
government target price range for new Islander homes
1st
highest construction costs of ten Caribbean jurisdictions in a BCQS market report
01 · The challenge

Islands that import every wall, in the path of every storm

The Turks and Caicos Islands sit in the Atlantic hurricane belt, almost every building material arrives by ship, and the population is growing faster than homes can be built. The result is a housing crisis for the people who live and work here.

A white two-storey SABS home on a coastal cliff above breaking surf
A SABS home on an exposed ocean cliff, Lāʻie Point, Hawaii
  • SEPT 2017

    Irma, then Maria, within two weeks. Irma passed south of the islands as a Category 5 storm. Salt Cay reported 100% building damage, South Caicos 99.9%, Providenciales close to 80% and Grand Turk just under 77%. About 1,285 utility poles came down.

  • COST

    Among the most expensive places to build in the region. Construction materials are a leading import, most of them from the United States, and every bag, stud and truss carries freight, duty and handling before it reaches site.

  • GROWTH

    Demand is outrunning supply. The National Housing Policy cites a population that could reach 55,498 by 2027, against 32,199 in 2012. The National Housing Needs Survey found many Islanders spending unsustainable shares of income on housing.

  • LABOUR

    Conventional building needs many trades. Framers, masons, roofers, insulators and finishers, often brought in from abroad. Every added trade is another schedule, another contract and another cost passed to the homebuyer.

Sources: Magnetic Media (Premier's Irma report, Sept 2017); TCI Department of Disaster Management and Emergencies, Nov 2017; TCIG National Housing Policy, Feb 2023; BCQS Caribbean market report via RTC 89 FM.

02 · Aligned with national policy

The Government has set the course. SABS helps deliver it.

Since 2023 the Turks and Caicos Islands Government has built a full housing framework: a policy, a delivery program, Crown Land for development and a new mortgage institution. What it needs now is a way to build faster, stronger and at lower cost.

FEB 2023

National Housing Policy

Social housing, first-time owners and existing homeowners, drawn from the 2040 Vision and the National Physical Development Plan 2020–2030.

2023 →

Home improvement program

Government-funded refurbishment for existing Islander homeowners.

JUNE 2025

Citizens' Contract 2.0

New homes for locals targeted at $197,000 to $239,000, with affordable, climate-resilient housing named a priority.

OCT 2025

Crown Land housing RFP

About 40 acres of Crown Land on Providenciales offered for turnkey communities of two and three bedroom homes.

JUNE 2026

Mortgage Corporation Bill

A new statutory body to widen access to mortgage financing for Turks and Caicos Islanders.

Where SABS fits. The Crown Land RFP asks for homes that meet the TCI Development Manual and Building Code. SABS is evaluated under ICC-ES ESR-1638 to the International Building Code and International Residential Code, with a Florida supplement to the Florida Building Code, the code written for the same hurricane belt (see the next section). It gives developers and the Government a code-evaluated route to climate-resilient housing, with savings in the structural frame and shell that help keep homes inside the Government's price range.

Sources: TCIG Department of Housing and Community Renewal; Magnetic Media (June 2025, Oct 2025); Newsline TCI (June 2026).

03 · Florida Building Code

Evaluated to the Florida Building Code. Permitted in Florida.

Turks and Caicos building control asked for one thing first: evidence under the Florida Building Code, the U.S. code written for the same hurricane belt. SABS carries it three ways: an ICC-ES Florida supplement, a registered Florida Product Approval, and SABS buildings permitted by Florida building departments.

FLORIDA BUILDING CODE · 8TH EDITION (2023)
FBC compliant

ESR-1638 Florida Supplement: SABS complies with the Florida Building Code, Building and the Florida Building Code, Residential.

ICC-ES EVALUATION
ESR-1638 · FL

Florida Supplement

  • 2023 Florida Building Code, Building
  • 2023 Florida Building Code, Residential
  • Design to the FBC; installation per ESR-1638
  • Issued alongside the base report covering IBC and IRC
View the posted report ↗
FLORIDA BUILDING COMMISSION
FL47115

Florida Product Approval

  • Registered in the State's Product Approval system on floridabuilding.org
  • The statewide system for structural frame and building envelope products
  • Approval number building officials list on Florida permit applications
Search FL47115 at floridabuilding.org ↗
FIELD RECORD
Permitted

SABS buildings in Florida

  • Multiple projects permitted with Easy Shell Construction of Sebring, Florida
  • Xtrata FEA, structural calculations and S-sheets in every permit set
  • Submitted with ESR-1638, the Construction Manual and the QC Manual
See the Florida work ↓
TESTING ON THE ICC-ES REPORT

The evidence behind the Florida supplement

ICC Evaluation Service issued the Florida supplement on the test data and engineering calculations filed under ESR-1638. The supplement concludes that SABS complies with the 2023 Florida Building Code, Building and the 2023 Florida Building Code, Residential, and that the installation requirements in ESR-1638 meet the Florida code.

How wind is designed. ESR-1638 requires the structural design of every SABS building to meet the code and the applicable edition of ASCE/SEI 7, the U.S. standard that sets wind loads. The analysis is done by registered design professionals trained and certified on SABS, finite-element analysis may be used, and the calculations go to the building official for approval before construction. Each Turks and Caicos building is therefore engineered to the design wind speed of its own site.

Evidence in ESR-1638Standard
Structural panel strength tests, composite systemASTM E72
Water penetration under air pressure, composite systemASTM E331
Roof covering fire test, composite systemASTM E108
Room fire test, composite systemNFPA 286
Coating compressive strengthASTM C109
Coating flexural propertiesASTM C947
Coating density and absorptionASTM C948 · C188
Coating shrinkage and thermal expansionASTM C531
Surface burningASTM E84
Accelerated weatheringASTM G155
Salt sprayASTM B117
Freeze-thaw cyclingCycling tests
Engineering calculations, composite systemFiled with ICC-ES

Permitted with Easy Shell Construction

Easy Shell Construction, a Florida contractor based in Sebring, builds SABS homes under Florida permits. For each model Xtrata delivers the SABS documentation and structural engineering the local building department needs to issue the permit, and answers the plan reviewer directly.

The same package, the same engineering and the same review process transfer directly to Turks and Caicos building control.

ProjectJurisdictionStatus
Bernal Model · single-familyHighlands County, FLFBC permitted
SLP Model · single-familyFloridaFBC permitted
Additional Easy Shell SABS homesFloridaFBC permitted
STEP 1

FBC supplement

ICC-ES confirms SABS complies with FBC Building and Residential.

STEP 2

Florida Product Approval

FL47115 registered with the Florida Building Commission.

STEP 3

Florida permits

Florida building departments review and permit SABS homes.

STEP 4

TCI building control

The same evidence package, submitted for approval in the Turks and Caicos Islands.

ESR-1638 with FL SupplementFL47115 Product ApprovalFlorida permit recordsSABS Construction ManualSABS Quality Control ManualSite-specific FEA & S-sheetsTest reports (ASTM / UL)

The ESR-1638 Florida Supplement covers the Florida Building Code, Building and Residential. Its High-Velocity Hurricane Zone provisions (Miami-Dade and Broward counties) are outside the supplement's scope. Wind design for each Turks and Caicos project is engineered to the site's design wind speed.

04 · Built by Islanders

Put the capacity to build in local hands

SABS is not a product you import and wait for. It is a method Islanders learn, certify in and own. Each project trains Turks and Caicos Islanders, creates construction jobs at home and leaves behind a local industry that keeps working after the contractor leaves.

Certify Islanders

On-site training and certification for local crews and contractors, so Islander-owned firms can bid and build SABS themselves.

Ship light, build anywhere

Precut panel kits pack into standard containers and reach Grand Turk, South Caicos, Salt Cay and North and Middle Caicos without heavy equipment.

Fewer trades, fewer delays

One crew sets the foam, bonds it and applies the shell. Four trades instead of up to eleven means less dependence on imported specialist labour.

Build between storms

Shells go up in days, so communities can be enclosed and secured inside the dry season, before the June to November hurricane window.

"A house that a Turks and Caicos Islander builds, a Turks and Caicos Islander can repair, extend and teach the next crew to build."

05 · The system

One shell. Three jobs.

SABS replaces framing, insulation and render with a single patented assembly. A core of Type II fire-retardant EPS foam, its panels fused into one piece by an 11 MPa PU foam panel lamination adhesive, is encapsulated in SABScrete: an extreme high-strength glass-fiber-reinforced cementitious coating. One assembly gives structure, insulation and a finish-ready surface.

OUTSIDESELECT A LAYERINSIDE
A SABS sample cube showing SABScrete, EPS foam and the orange lamination line

The real wall, in your hand.

Grey is SABScrete, white is EPS foam, orange is the Foam Panel Lamination (11 MPa) PU adhesive. No timber to rot or feed termites, and no steel framing for salt air to corrode.

EPS foam shell under construction with scaffolding
STAGE 1

Set the foam

Lightweight EPS panels are cut, placed and bonded into walls, floors and roof. No lumber, no steel studs.

SABScrete applied over the foam shell
STAGE 2

Apply SABScrete

The reinforced cementitious shell is sprayed and trowelled over the foam, creating a monolithic structural envelope.

Finished white SABS home
STAGE 3

Finish directly

Paint, plaster, render or cladding go straight onto the shell. Structure, insulation and finish in one application.

Fewer trades. Faster crews.

A conventional building needs up to eleven separate trades. SABS needs four, and crews are trained in weeks. U.S. Navy Seabees on a training exercise raised a complete SABS building in five days.

SABS4
Masonry8
ICF9
SIPs10
Steel frame11
Timber frame11
06 · Built for the hurricane belt

Wind, water, salt and sun. Tested for all four.

The islands that suffered most in 2017 are low, exposed and surrounded by salt water. SABS forms one continuous shell from foundation to roof, with no joints for wind to pry open, nothing to rust and nothing to rot.

250MPH

Wind tested

A storm-rated envelope beyond the strongest winds Irma brought.

500HRS

Salt spray

ASTM B-117 passed. No ferrous framing for sea air to corrode.

0%FLAME SPREAD

Class A

ASTM E-84 flame spread 0%, smoke 0. Class A wall and roof.

U 0.076–0.057W/m²·K

Cooler homes

A continuous EPS core cuts cooling loads where electricity is costly.

Finite element analysis of an arched SABS shell under wind load
Figure 01 · Wind load case, 120 mph · arched SABS shell, FEA by Xtrata

Engineered by analysis, not guesswork.

Xtrata designs every kit in-house and runs finite-element analysis for wind, seismic and equipment loads. These figures are from an arched SABS shell analysed at hurricane-force design wind.

The FLOAT House in New Orleans
New Orleans · after Katrina

Flood: the FLOAT House

Designed by Morphosis for the Lower Ninth Ward, the FLOAT House rises with floodwater on guideposts. Its lightweight prefabricated SABS panels formed a monolithic, flood-resistant shell.

Completed SABS home
Design life

250–300 years

An inorganic shell with no wood to rot or feed insects, built for a coastal climate that destroys conventional framing.

A finished SABS prefabricated building on a trailer
Prefabricated

Ready-to-set modules

Finished SABS modules can be built under cover and set on site, for rapid shelters and replacement homes after a storm.

07 · Proof of concept · Haiti

Proven next door, with local hands

Haiti lies just south of the Turks and Caicos Islands, across the same waters and the same storm tracks. After the 2010 earthquake, SABS was used there to rebuild with local crews.

Completed SABS building in Haiti with residents carrying water
Haiti · 2011 · the first SABS building, complete
6.5DAYS

Haiti · 2011 · with UNICEF. Strata joined UNICEF's rebuild and trained local Haitian civilians on the system. The first SABS building, 2,000 sq ft including electrical, plumbing and finishes, was completed in 6.5 days.

At the opening ceremony, former U.S. President Bill Clinton presented SABS as a sustainable, quality method to rebuild Haiti.

THE SAME MODEL FOR THE TCI: CONTAINER IN, LOCAL CREW TRAINED, BUILDING HANDED OVER.
Local crew gathered at the container kit in Haiti
Container kit arrives
SABS shell on piers in Haiti
Shell on piers
Local crew applying SABScrete in Haiti
Local crew coating
Opening ceremony in Haiti
Opening ceremony
FILM · ONE-DAY TIMELAPSE
Mexicali · 2011 · with Fanosa

Foundation to finish in one working day

With Fanosa, one of Mexico's leading foam manufacturers, 400 sq ft homes were engineered to be built from the ground up, including utilities and finishes, within one working day.

U.S. Navy Seabees standing up SABS walls
Okinawa · U.S. Navy Seabees

A complete building in five days

Seabees of NMCB 5 assembled a SABS building at Camp Shields as a training exercise, from precut panels engineered by Strata.

A SABS unit lifted by crane
Government units · 2025

One unit, one day

Government 300 sq ft SABS units, each built in one day, using the same prefabrication approach that produces ready-to-set modules.

08 · See it built

From foam to finished shell

FILM · 2026 SABS Start to Finish: foam set-up, adhesive, shoring and the SABScrete shell, filmed on a real build. Lamination seams pull-tested at 1,350–1,600 lbf.
TIMELAPSE · Maui, Hawaii · an island build, shell complete in 67 days
START17 Sept
END23 Nov
CREW4
DAYS67
09 · Proof and compliance

Ten years of testing. Multi-million-dollar investment.

SABS has been tested by independent laboratories to U.S. standards and evaluated by ICC Evaluation Service, the body building officials across the Americas rely on to accept alternative systems.

Level 5

Seismic

Cyclic racking shear, in plane: 6 of 6 specimens passed.

STC 52+

Sound

Quiet homes, classrooms and clinics.

1,800PSI

Coating flexural strength

Governing value for the SABScrete shell.

10CYCLES

Freeze-thaw

ASTM C-297, 5 of 5. Durable well beyond tropical demands.

First page of ICC-ES Evaluation Report ESR-1638
ICC-ES ESR-1638IBC / IRCFBCFL47115ULASTM

ESR-1638 confirms compliance with the International Building Code and International Residential Code. Supplements cover the California, Los Angeles and Florida codes, among the most demanding U.S. jurisdictions for seismic and hurricane loads.

TestStandardResult
Fire resistanceASTM E-119Pass · Type V-B
Surface burningASTM E-84Flame 0% · Smoke 0
Roof classificationUL 790 / ASTM E-108Class A
Room corner burnUL 1715Pass
Cyclic racking shearIn plane6 of 6
Axial and bendingMonotonic, transversePass
Compressive strengthASTM C-10915 of 15
Salt spray, 500 hoursASTM B-1173 of 3
Freeze-thaw, 10 cyclesASTM C-2975 of 5
Accelerated weatheringASTM G-1555 of 5
Water penetration, wallsASTM E-5143 of 3
10 · Cost and the local economy

Built for less. Built here. Built by Islanders.

Affordability is the reason SABS exists. This chapter sets out what the SABS shell costs in the U.S. market, what our own bids and builds have shown, what building costs in the Turks and Caicos today, how the two compare, and how Xtrata plans to build the supply chain inside the islands so more of every construction dollar stays here.

A · U.S. MARKET

What SABS saves on the shell in the United States

10–15%

Shell savings vs. wood frame

Structural shell scope.

25–30%

Shell savings vs. steel / CMU

The closest match to TCI block-and-concrete construction.

MOST RELEVANT TO TCI
5–10%

Total project vs. wood frame

Whole-building effect once finishes and systems are included.

10–15%

Total project vs. steel / CMU

Shell savings carried through to the full project.

MOST RELEVANT TO TCI
10–15%

U.S. schedule savings from faster construction

20–30%

U.S. estimated energy (operating cost) reduction

67 days

To a finished shell on the Maui island build, four-person crew

4 trades

Instead of up to eleven, so fewer subcontracts to price and schedule

U.S. figures: Xtrata SABS Global economics, averaged across past U.S. SABS projects and based on U.S. construction and shell costs. They are not a guarantee of savings on any individual project, and savings apply to the structural frame and shell.

B · PROJECT RECORD

What our own bids and builds show

$170 / sq ft

Custom home, Arizona

All-in build cost on 2,602 sq ft under roof. New homes in the same ZIP code were listed at $380 to $586 per sq ft.

BUILT
≈25%

Sales gallery, UAE · block and concrete

Saving on the comparable shell scope against a contractor's priced bill of quantities: about US$58,600, or 10.3% of the whole building bid.

SUBMITTED PROPOSAL
14.1%

30-unit apartments, Florida · CMU and concrete

Shell scope priced both ways by a Florida contractor: $4.99M conventional, $4.29M with SABS, a saving of $704,442.

CONTRACTOR COMPARISON
22.2%

44-unit live/work, Nevada · wood frame

Saving of $827,319 on the framing, truss, insulation and drywall scope SABS replaces, against a contractor's bid.

ESTIMATE

Project figures: Xtrata comparisons prepared in 2026 against each contractor's own bid. One is a completed home and three are bid-stage comparisons. Savings are specific to the structural frame and shell scope SABS replaces. Listing prices include land and builder margin. These are results on individual buildings, not a forecast for the Turks and Caicos.

C · TURKS AND CAICOS MARKET

What building costs in the islands today

Residential multi-storey · investment
$302–490
Residential multi-storey · owner occupied
$450–736
Hotels · 3-star
$278–426
Hotels · 5-star
$438–720
$0$200$400$600$800 / sq ft
Block & concrete

Concrete block and poured concrete dominate; wood framing is generally not permitted

Imported

Most blocks are imported, often from the Dominican Republic, then barged between islands

10% + 5%

Typical duty on building materials, plus the 5% customs processing fee

$724 / sq ft

2025 median home price across all islands, land included

Sources: Rider Levett Bucknall, 2026 Caribbean Report (US$ per sq ft of gross floor area, construction cost); VisitTCI building and real-estate guides (2025).

D · BASE COMPARISON

SABS and traditional construction in the Turks and Caicos

ItemTraditional TCI buildSABS
StructureConcrete block walls, rebar, poured columns, beams and roof; insulation and render added separatelyEPS core and SABScrete shell: structure, insulation and finish-ready surface in one assembly
Trades on the shellUp to 8 for masonry construction4, with one trained crew setting, bonding and coating
Materials to shipHeavy block, aggregate and steel, barged to the Family IslandsLight panels and bagged SABScrete by container, with local manufacturing planned
LabourSpecialist trades frequently filled through work permitsCertified Turks and Caicos Islander crews and contractors
Shell scheduleMonths, with curing and multiple trade hand-offsDays to weeks: 6.5 days in Haiti, 67 days on Maui
Storm and saltCode-built block; steel subject to salt-air corrosionTested to 402 km/h wind; 500-hour salt spray passed; nothing to rust or rot
CoolingBlock walls with limited continuous insulationContinuous insulation, U 0.076–0.057 W/m²·K, smaller AC systems
Shell costLocal block-and-concrete shell pricingU.S. data shows 25–30% shell savings vs. steel / CMU; TCI pricing being confirmed locally
!

How to read this comparison

This comparison is based on the sample project conducted in the Turks and Caicos, together with published market data. Actual cost depends on the design, the island, the site and local quotations. Xtrata is doing the engineering, pricing and supply-chain research now so that cost and affordability remain the first priority, and every number put to the Government will be backed by local figures before it is relied on.

E · MADE IN THE TURKS AND CAICOS

A local SABS industry within 2 to 3 years

NOW

Import and prove

Panel kits and SABScrete arrive by container. Demonstration homes and the first projects are built on Providenciales.

YEAR 1

Certify Islanders

The SABS academy trains and certifies local crews, contractors and inspectors on live projects.

YEARS 2–3 · TARGET

SABS manufacturing

A Xtrata manufacturing facility in the Turks and Caicos producing SABScrete and fabricating panel kits locally.

YEARS 2–3 · TARGET

EPS foam plant

A foam manufacturing plant on the same timeline, so the core of every wall is made in the islands.

PLANNED FACILITY

SABS manufacturing

  • SABScrete production close to the job sites
  • Panel cutting and kit fabrication for all islands
  • Skilled manufacturing jobs for Islanders
  • Less imported freight, duty and lead time
PLANNED FACILITY

EPS foam manufacturing

  • Type II fire-retardant EPS blocks and panels made locally
  • Removes the bulkiest item from the shipping bill
  • Supplies SABS and other local insulation needs
  • Positions the islands to supply neighbouring markets

Facility plans and timelines are targets and depend on Government approvals, site selection and program volume.

F · THE ECONOMY

Keep the construction dollar in the islands

TODAY

Money that leaves

Imported blockFreightDuty and feesForeign specialist labourInter-island bargingOverseas contractors
WITH SABS MADE HERE

Money that stays

Islander wagesLocal manufacturingLocal foam plantIslander-owned contractorsCertified inspectorsLower household energy bills
2,846

New work permits on the horizon

The Premier said most are tied to tourism and construction. Every certified Islander crew means fewer permits are needed.

950+

Resort units through 2027

Eighteen resort projects in progress or planned on Providenciales keep demand for builders high.

5.6%

Real GDP growth in 2024

A growing economy that can carry a new local construction industry and the jobs it creates.

Sources: Magnetic Media (Premier on work permits, Nov 2025); Rider Levett Bucknall, 2026 Caribbean Report.

11 · The program

A national program in four phases

Start with a training academy and demonstration homes on Providenciales, then scale across every inhabited island, with Islander crews taking over more of the work at each step.

PHASE 1

Academy and demonstration

A SABS training site on Providenciales, with demonstration homes the public, building officials and lenders can walk through.

  • First certified Islander crews
  • Code review with TCI building control
PHASE 2

Islander communities

Two and three bedroom homes for Crown Land developments and first-time owners, built with local contractors.

  • Aligned with the National Housing Policy
  • Financing through the new Mortgage Corporation
PHASE 3

Family Islands resilience

Hurricane shelters, community centres, schools and clinics on Grand Turk, South Caicos, Salt Cay and North and Middle Caicos.

  • Container kits, no heavy equipment
  • Safe rooms ahead of the storm season
PHASE 4

Local industry

Islander-owned contractors and a local supply base for SABS materials, serving homeowners, developers and the resort sector.

  • Staff housing for the tourism workforce
  • Rapid replacement homes after a storm

Islander homes

Two and three bedroom family homes.

Hurricane shelters

Monolithic safe buildings for the most exposed islands.

Schools and clinics

Quiet, cool, Class A fire-rated public buildings.

Workforce housing

Staff housing for hotels, resorts and essential workers.

Backyard units

SABS pod kits for extra rooms and rental income.

Every typology uses the same panel kit, the same trained crews and the same inspection process, so each project builds on the last. Cost comparisons are prepared per project on area under roof, with savings specific to the structural frame and shell.

12 · Next steps

From a conversation to homes on site

SABS was invented by Dr. Nasser Saebi, P.E., S.E. Xtrata carries it forward with in-house design and FEA engineering, prefabrication and builder training.

STEP 1

Define the program

Sites, unit types and priorities with the Government, the Housing department and partners.

STEP 2

Engineer and submit

Xtrata designs the kits, runs FEA to TCI wind loads and prepares the ESR-1638 and Florida Building Code submittal for building control.

STEP 3

Train Islanders

The academy certifies local crews and contractors on the first demonstration homes.

STEP 4

Build and scale

Container kits ship, Islander crews build, and the program expands island by island.

Support

Xtrata Support

Program, technical and approval questions for the Turks and Caicos.
+1 (602) 684-9260 · xtrata.com

Xtrata headquarters

Tempe, Arizona

1437 W Auto Drive, Tempe, AZ 85284
+1 (602) 684-9260 · xtrata.com